David - I remember when they were building the bypass, some of my friends and myself would attempt to ride our bikes up the new highway(the part that was above the current work area). Gosh that was tough as it was all leg power back then(no 10 speed bikes)..
2 comments:
This is when the 56 bypass ended in Dale Boro.
David - I remember when they were building the bypass, some of my friends and myself would attempt to ride our bikes up the new highway(the part that was above the current work area). Gosh that was tough as it was all leg power back then(no 10 speed bikes)..
Post a Comment